HTTP 422 from API for https://api.rotary-cloud.co.uk/api/v1/club-memberships?districtNumber%5Beq%5D=&riMemberNumber%5Beq%5D=8329301&incPrimaryEmail=1&incRotarian=1&paginate=1
{"message":"Validation errors","errors":{"districtNumber.eq":["The districtNumber.eq field must be an integer."]}}
PROJECT COMPLETION REPORT
FUNDED BY:
NANTWICH ROTARY, CHESIRE, ENGLAND, UNITED KINGDOM
LOCAL PARTNER:
RC THE HIMALAYAN GURKHAS
ROTARY INTERNATIONAL DISTRICT 3292, NEPAL
SHREE ANPU VILLAGE GHANPOKHARA – 7
WEST NEPAL
Google Map Reference: 28*18’56.91”N 84*19’02.60”E Altitude 5914ft
Local coordinators:
Major Bhim Bahadur GURUNG MVO MBE PHF
Major Gopal Bahadur GURUNG MBE MPHF
INCOME:
Fund Received from Rotary Club NANTWICH Rotary, Chesire, UK |
£ 4,990 |
Rupees 678,240.00 |
EXPENSES:
a. |
GI Strainer One and half Inch -2 |
2,000.00 |
Intake fitting |
b. |
GI Socket One and half Inch -2 |
800.00 |
|
c. |
GI Union One and half Inch -2 |
800.00 |
|
d. |
GI Socket 3inch 2 x 90 |
180.00 |
|
e. |
Brass Union 5x350 |
1,750.00 |
|
ee. |
Brass Union short 5 x 300 |
1,500.00 |
|
f. |
White cement bag 2x850 |
1,700.00 |
|
g. |
Gate Valve One and half Inch |
4,200.00 |
|
h. |
Water Intake 2 building cost 2 x 6300 |
12,600.00 |
|
i. |
Valve chamber to build cost |
4,100.00 |
|
j. |
Sand and aggregate tractor per trip cost 800 – 4 |
3,200.00 |
|
k. |
Cement OPH bags 40 X 865 |
34,600.00 |
|
l. |
GI Nipple 2 Inch 5x560 |
2,800.00 |
|
m. |
GI Nipple 1 inch x 5x225 |
1,125.00 |
|
n. |
Wire mesh 6m x 65 |
390.00 |
|
o. |
HDPE PIPE 10kgs 32mm 2480meters x 112 |
277,760.00 |
|
p. |
Transport charge |
2,600.00 |
|
q. |
Hire Tiles cutter machine |
6000.00 |
|
r. |
Unskilled labours 1400m pipe line digging and filling |
86500.00 |
|
s. |
Skilled tradesmen building two water Intake and a reserve tank and 5 water supply STANDs with Tilling |
158,400.00 |
|
t. |
White Marble Tiles 12"x18" [ 27pack x700] |
18,900.00 |
|
u. |
Marble Engraving |
5,000.00 |
|
v. |
Polithine pipe for work site |
800.00 |
|
w. |
1 inch brass union 5x550 |
2,750.00 |
|
x. |
Bricks two tripe [ Local Tractor ] |
48,000.00 |
|
y. |
Tools for digging, cutting |
5,000.00 |
Handed over to village committee |
z. |
Total Expenditure- |
683,455.00 |
|
|
Contribution from the local beneficiaries |
|
5215 |
Signed: xxxxxxx Signed:xxxxxxx
Rtn Krishna Prasad ADHIKARI MPHF Rtn Major Bhim Bahadur Gurung MVO MBE
President PP/Community Svc projects
back International Committee